Additional Reliability Study for. Evaluation of the Impact of the Retirement of the. Ginna Nuclear Generation Station. On the New York State Transmission System. Barrett Power Station 138kV LIPA 428 Island Park Energy Center, LLC Island Park Energy Center SCPP 1/24/14 262. Project is not proposed or under consideration within the NYISO Comprehensive Reliability Planning Process. Porter Station Bulk Power Upgrades Niagara-Packard #195 rebuild Dunkirk Breakers Lockport Breakers. Reliability Assessment Program established by the Northeast Power Coordinating. The RGE Station 255 project that taps the existing Somerset. If not, the NYISO will address any. NYISO Interim Report on the August 14, 2003 Blackout. NYISO Interim Report on the August 14. Extending the system to blacked-out areas to provide station power and customer load. PUBLIC SERVICE COMMISSION CASE 03-E-0188. Long Island Power Authority Original Leaf No. 282 Effective: January 26, 1999 Tariff For Electric Service IX. Long Island Choice Program. A black start is the process of restoring an electric power station or a part of an electric grid to operation without relying on the external transmission network. Normally, the electric power used within the plant is. Black start - Wikipedia, the free encyclopedia. A black start is the process of restoring an electric power station or a part of an electric grid to operation without relying on the external transmission network. If all of the plant's main generators are shut down, station service power is provided by drawing power from the grid through the plant's transmission line. However, during a wide- area outage, off- site power supply from the grid will not be available. In the absence of grid power, a so- called black start needs to be performed to bootstrap the power grid into operation. To provide a black start, some power stations have small diesel generators, normally called the black start diesel generator (BSDG), which can be used to start larger generators (of several megawatts capacity), which in turn can be used to start the main power station generators. Generating plants using steam turbines require station service power of up to 1. It is uneconomical to provide such a large standby capacity at each station, so black- start power must be provided over designated tie lines from another station. Often hydroelectric power plants are designated as the black- start sources to restore network interconnections. A hydroelectric station needs very little initial power to start (just enough to open the intake gates and provide excitation current to the generator field coils), and can put a large block of power on line very quickly to allow start- up of fossil- fueled or nuclear stations. Certain types of combustion turbine can be configured for black start, providing another option in places without suitable hydroelectric plants. Often this will happen gradually; starting the entire grid at once may be unfeasible. In particular, after a lengthy outage during summer, all buildings will be warm, and if the power were restored at once, the demand from air conditioning units alone would be more than the grid could supply. In colder climates a similar issue can occur in winter with the use of heating devices. In a larger grid, black start will often involve starting multiple . The power stations involved have to be able to accept large step changes in load as the grid is reconnected. Note that there are multiple methods of commencing a black start: hydro- electric dams, diesel generators, open cycle gas turbines, compressed air storage, and so on. Different generating networks take different approaches, dependent on factors such as cost, complexity, the availability of local resources (i. Once up to speed these gas turbines are capable of running the entire plant associated with the rest of the power station, negating the need to bring power in from other sources. An example of this is the Didcot power stations where the 'A' station (a large coal- fired station consisting of four 5. MW generating units) was fitted with a gas turbine for each unit, enabling black- start capability for the entire station. The newer gas- fired 'B' station built adjacent (consisting of two 7. MW generating modules) was not fitted with its own Open Cycle Gas Turbine (OCGT)'s, instead relying on the 'A' station to start first. With the closure of the 'A' station under the European Union's Large Combustion Plant Directive, the supplies and controls for the small gas turbines have been transferred to the 'B' station, ensuring that the Didcot site maintains independent black- start capability. In the North American independent system operators, the procurement of black start varies somewhat. Traditionally, black start was provided by integrated utilities and the costs were rolled into a broad tariff for cost recovery from ratepayers. In those areas which are not part of organized electricity markets, this is still the usual procurement mechanism. In the deregulated environment, this legacy of cost- based provision has persisted, and even recent overhauls of black- start procurement practices, such as that by the ISO New England, have not necessarily shifted to competitive procurement, although deregulated jurisdictions have a bias for market solutions rather than cost- of- service (COS) solutions. In the United States, there are currently three methods of procuring black start. The most common is cost- of- service, as it is the simplest and is the traditional method. It is currently used by the California Independent System Operator (CAISO), the PJM Interconnection. Although the exact mechanisms differ somewhat the same approach is used, namely that units are identified for black start and their documented costs are then funded and rolled into a tariff for cost recovery. The second method is a new method used by the Independent System Operator of New England. The new methodology is a flat rate payment which increases black start remuneration to encourage provision. The monthly compensation paid to a generator is determined by multiplying a flat rate (in $/KWyr and referred to as the $Y value) by the unit's Monthly Claimed Capability for that month. The purpose of this change was to simplify procurement and encourage provision of the black start service. The final method of procurement is competitive procurement as used by the Electric Reliability Council of Texas. Under this approach ERCOT runs a market for black start services. Interested participants submit an hourly standby cost in $/hr (e. Using various criteria ERCOT evaluates these bids and the selected units are paid as bid, presuming an 8. Each black start unit must be able to demonstrate that it can startup another unit in close proximity to begin the islanding and synchronization of the grid. In other jurisdictions there are differing methods of procurement. The New Zealand System Operator. Other jurisdictions also appear to have some sort of competitive procurement, although not as structured as ERCOT. These include the Alberta Electric System Operator. Wind turbines are not suitable for black start because wind may not be available when needed. The black- start unit must also be stable when operated with the large reactive load of a long transmission line. Many high- voltage direct current converter stations cannot operate into a . This is not true of PWM- based (voltage- source converter) HVDC schemes. Power Systems in Emergencies - From Contingency Planning to Crisis Management John Wiley & Sons 2. ISBN 9. 78- 0- 4. The 'Black Start' Situation^Philip P. Walsh, Paul Fletcher Gas turbine performance, John Wiley and Sons, 2. ISBN 0- 6. 32- 0. X, page 4. 86^Introduction to Black Start(National Grid plc) Covers technical and commercial background.^See PJM Tariff: Schedule 6. A of the PJM Tariff, available online at: http: //www. Blackstart Business Rules, available online at: http: //www. Documents/consult/se. ER0. 3- 2. 91, Federal Energy Regulatory Commission , Issued Feb. Part- C- sched- C5- 1. Nov. 05. pdf^See http: //www. Nov. 05. Wayne; Fink, Donald G.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
January 2017
Categories |